TheCrabsHomestead

Stage 19: Floor Prep 2- Laying PLywood

After the insulation job was done, we moved onto laying the plywood down! More construction and building up! Again to save on head room we went with 3/4″ plywood..or possibly a little thinner than that. We used wood screws, finally, to screw the pieces into the wood furring strips. The hardest part was cutting around the wheel wells and in the front of the bus. Also, the bus is not exactly 8′ wide so one side of the bus it was super easy laying down the 4′ wide by 8′ long plywood, but the other side had to be cut a few inches to fit nicely.

IMG_20151106_104019
Even had a little helper…Homeschool Woodshop 101!
20151105_164330
Just how I like my men; Shirtless, Bearded, and wearing a tool belt 😀
20151105_165835
Construction zone…what what?!
20151105_164526
The difficult last bit!
20151105_155036-1
The pic explains itself really 🙂
20151105_172312
Plywood Doneskies!
20151105_172242
Plywood Back to Front

2 responses to “Stage 19: Floor Prep 2- Laying PLywood”

  1. […] Back to Stage 19: Floor Prep 2-Laying Plwood […]

    Like

Leave us a message!

This site uses Akismet to reduce spam. Learn how your comment data is processed.