After moving to West Texas and all of the dirty bus electrical we cleaned out, it was time we cleaned Chitty Bang again. We were also ready to start building!! What…what is that I said? YES! No more Demo! We are constructing things now! Well almost…..first things first:)
First, the girls and I cleaned…again..


Next, we decided that since the floor was pretty scratched from all of our moving crap that we would go ahead and repaint the floor to prevent any rust from coming in and spreading like cancer…we also sanded any spots that needed to be…probably only 2 small spots though.





And lastly, we had to install some “furring strips” so we could have space between the metal and the plywood we laid down later so the closed cell foam we were going to spray would have room to insulate the floor as least a half inch to an inch. We also had to save any head room we could since Crab is 6’2″ and the bus height of the ceiling was inches from his head. Which is why we opted to lay them flat instead of on their sides.


Now, Onto Stage 18: SPRAY FOAM INSULATION!
or Back to Stage 16: Covering Windows, Lights, ETC
[…] Stage 17: Flooring Prep 1 […]
[…] Go to Stage 17: Flooring Prep 1 […]
Also what was your Spacing Between Furring strips?
What Sized Lumber Did you use?